Show leamington leavington Lea cot cut off the leamington leavington Lea out off milea miles in length between salt lake and learning ton ig is virtually completed the track laying gang connected the rails of the new line and the tle main line saturday n and it is now poss ble bie for a train to run over the full leneth of the cut out off there still remains considerable work in the way of surf surfacing acing the grade but fo for r the purposes of surface the line was corn plated saturday night the work was commenced in april of last year and since that time hag has been going steadily ahead |