Show u College Heating Plant Enlarged A 1 n new w fire tube boiler is be being being being be- be ing installed at the Snow College College College Col Col- lege heating plant which should increase the plants plant's capacity b by y some 50 per cent according t to Director J. J Elliot Cameron Floyd Floy d Atkin of Cedar City has th the e contract and construction Is no now w underway It should be completed completed com con by the time school opens open s in September Director Cameron Camero n states i The plant Is of sufficient size siz e to take care of all buildings no noon noVion now noVi w I on the campus of the ne new w purpose multi building for which bids should be advertised soon SoOl after July 1 I and for another building of oC comparable size The Th e purpose multi-purpose building will b bE constructed on the corner of the block east of or th thE College campus Another building building build ing is being planned for th thE southwest Louis Petersen Peterson corner corner corner cor cor- ner of the block bU but there are areno areno areno no details as yet Director Cameron Cameron Cameion Cam- Cam eron eion reports George W. W Poulson of Salt Lake City is consulting engineer for the heating plant and was In Ephraim on that business Saturday He was a missionary In Hawaii when the R R. C. C Coxes were there and he and Mrs Poulson and a daughter visited briefly at the Cox home Satui Sat- Sat ui day o- o |