Show NEW BANK QUARTERS active operations on the remodeling of the state bank have begun the basement has been excavated and the concrete bork is now being put in the improvements in the bank buildt build ing will include an addition forty five c feet back and the full width edth 0 of f the present building in the I 1 which ilas has a full basement will be located the vault built from the bottom of the basement and up thru the first ali st floor the vault will be ben it two to story affair the basement compartment being used for storage purposes and the top compartment for regular bank work the banking rooms on the ground foor floor will be fitted up in sumptuous style with marble facings around the walls hai ha f way up lip to the ceiling and the front of the bank counter will also be of marble the offices will be rl her back giving more ron rom for tha th public i lobby which wll lei ie arjang ar rancil leil so 0 o that a space the antl i iio o width of the building will occupy the immediate entrance and then the bank counter will run east cast and west with windows facing south at the west end of the counter will be the cashiers desk and the directors room will be placed in the new addition there will be no change in the front of 0 the building except tor for the installation of a new door A big sky liblit will extend the entire length ot of the building giving perfect lighting and ventilation the building will wi 11 lie be C quipped with lavatories cloak room I 1 and will be warmed by a modern beating system the estimated cost of it the improvements is thomas thoma s whittaker is the contractor and the plans were were gotten out by Shree vi sc alada n ot of ogden |