Show improvements AT THE DEPOT the oregon short line company are preparing to make some improvements at the local yards that will increase the facilities for handling trains at the depot and incidentally add much to the convenience of 0 the public generally the company has hag razed the house formerly owned by sire mrs W 11 II crag bead and cleared the premises preparatory pax atory to laying another track to accommodate the branch passenger traffic it Is the intention to cut down the hill bill on the west side of the tracks south of 0 the depot so that incoming trains from the south can be seen at a greater distance and carl can run tato into the yards without having to make such a sharp turn at the approach every morning there are three passenger trains at the depot within thirty minutes and two of 0 them are there at the same time making a congestion that is ia not only inconvenient but somewhat dangerous and the th extra will relieve the situation materially A more detailed report of 0 the proposed improvements Is not obtainable at tola this writing writ lne |