Show NEW iffla i E 8 three story brick with thirteen rooms to cost between and has plans about ready several of the members of the em ery stake academy board of education met with prof horace cummimgs and other church authorities in salt lake city on monday and discussed thi size plans and site for a baiger academy an understand ng was arrived as to size and a general plan but the question of site was left open awhile longer arch iteck watkins of provo is now working on the plans and specifications which may be at the next quarterly confer of the stake at perron on mr watkins filst plans ed a 35 building containing 16 class and assembly rooms above the basement he was instructed to draw plans for a somewhat smaller bu iding one with about 13 rooms some of which will be in the basement the will be a three story anck structure tuie with a basement bf high enough to make it available for other purposes besides furnace and storage rooms mr walking met with the board in salt lake and obtained a fair knowledge of what was required here |