Show boltl Ol tl MS ON MIll hill TUNNIA Tir MI ill 11 ING IN PUS PROVO april 9 the strawberry tunnel was as extended feet during the month ot of march biking a total 0 of feet of excavation to date the flow ot 01 water from the tunnel has hag considerably retarded the work for the past three or four months thero there Is now about gillons of 0 water flowing out of the tunnel every minute and it was thought at first that the flow was only temporary but since tle water is encountered it has rather than diminished |