Show strawberry TUNNEL IS progressing SLOWLY PROVO aeb 3 J L 1 lytel ell en kineer in charge of the tile strawberry tunnel that the tile tunnel has only been driven one hundred and fifty feet in january thia this ie is about one third of the ho average monthly distance of lite pile tho tile reason for the short distance arlien la Is that the flow floa of water baa has with tho the ork for over a month there Is a flow of water of thirty five thousand gallons a minute lytel expects the flow floi to subside if it does not it will be sealed up tit until the tunnel la Is completed when it will be released and added to the how flow from the Str strawberry auberry val ley |