Show MACHINERY HAS ARRIVED today the city Is unloading part ol of the machinery for the installing ot of the other unit at the power plant which will be set in place immediately in the consignment which arrived yesterday is one 3 phase 12 pole water wheel generator switchboard pipes and connections and other fixtures the balance of the equipment is expected soon I 1 and the outlook is that not many weeks will pass by before the city will be able to generate another horse power of electrical current |