Show progressing the abe work of constructing the levee on the west side of jordan for the res reg retrieval of the thoele roid from the dominion of the flood preparatory to its being repaired and constructed reconstructed le so that it may again awain again 0 be b usable a progressing and has been so far completed that teams not heavily loaded can pass pabs a on the embank embankment in crit erit and it will boon soon be completed if no unforeseen obstacle shall be presented to cause delay it has been more of a job than supposed before it was commenced me aced but when finished will be a permanent improvement which those who have buit suiT buffered suffered ered so many inconveniences from the operations of the long iong continued flood will appreciate |