Show cement W water er pipea pes I 1 dimm voi 9 NN I 1 PIPES th certainly be beyond ap nd tb the reao read the bottom made mad av level 9 pd lod e edwi eft I 1 I 1 IS inches wide abrupt turn tarns avoided I 1 9 OF 01 THIS CF cayet km T I 1 qualitz of aird li rd W clean aar i be procured I 1 cured fr fresh e A ground li lube in 1 preferred and the proper apropo 1 I 1 burthel of lime to two bottand th the be thoroughly mixed before adiv wal we to them and jtb the e water added add ed to fo 0 01 quantity what cap be used biferi I 1 a liine it should be bewell bevell vell perllie lice mortar used for pl punsters astel I 1 con A 0 N or OP tha r hn PIPE P F E insap when the ditch is read yead ready y tny morter a 0 box is brought into us nse for e ca swe same to the ae ditch it is ia made inch boards about five ave feet feel long wide and three inches deep the tl tie flait flaring g so that the mortar may wi thease this Thi mold Is filled fillod ev small board being held against ast and the mortar p re g s eto ti t bul be 0 coi I 1 a trowel and carried car ri e d to the t dite ditch I 1 tw two 0 men fuen we are standing anding fl it to rehei empty emliy it so an tho the middle of tibe che bot botts z same sata A rod bod five ave I 1 an and d a half fi t feebly smooth and odthe of the dia desired pipe generally an ind incata i I 1 ora or a tier a piece of the a sai foot loag 1 connected to it b by bi a ge flies tr er pipe ia laid on the tb e I 1 cement anki a one naif alf of its ita diamen into 1 ij I 1 raold fall of cement is ie placed aed onn on the farr and pressed d w of 61 mortar about six iu inches I 1 rod ioa in the centre centra the mold i ll 11 and then each man with fiffia a trow I 1 1 I 1 sides and perfects the I 1 joints joinis 0 VU o I 1 ve five feet I 1 7 1 I 1 fine earthle earth is then thrown in in I 1 I 1 t led down on each side aide of the a about six inches of dirt throda ro ati 3 tb the e top the end of ahe TO rod I 1 p elou enough hf I 1 for or one man to 0 ra I 1 I 1 the bother 1 place so as ta 0 A the t e ce cei pent ant tp to prevent p rev ent a kin king off office e en as tharps tha rod sta to the rod red a ai little men bet draw it to io I 1 which being bein flexible e ile allows the ro ed baca over v the finished shed part art w I 1 I 1 mold of oem kemt must be careful cairel I 1 i the 0 old r hard by this ai tit of trowel down beffre put aar tar and the daft and then draw th t forming all with care and nan q OF I 1 tha 1 ATE log affords the tie best me means aus of the waiter to tu n pl pipe i pe at t is anil and cemented A t to 0 the pipe the affie othor extends inte the hold bold a at tahe the end ot stoy OPI aoam ber some four inches sq I 1 1 the lower aide of the log in with s keep ona on leaves and ait dirt I 1 th r I 1 ment prevents pr eventa I 1 the clogging of t 1 I 1 tal iii the water to is some inch indies as at al tranee taie oad Is covered I 1 a far fai a apos possible gible so asje ar pre ev oy JP vr Ett STOCK YV wl I 1 lead pipe aois 18 connected with thea plastering wound I 1 edund isaid it and hen 66 1 I 1 joined to is brought up toad delivered may mav 1 teamed down thae gilb palis I 1 similar nilar lead pipe jointed ik t e 11 ii as to carry earr iti it on this is perhaps IN th beail best plan I 1 aul wul benal ft a jw or 11 ll stock fofiu not break I 1 aas it atwil A TO io prevent of the 1 fusae I 1 0 w and fill it ith old tanbark a I 1 abare t this k kept a p 6 I 1 I 1 I 1 I 1 would nos autta percha ha i I 1 ir iron 0 be atti X t th h eded I 1 penstock peD pen stoA join jointing I 1 ting a and I 1 ad ined 1 1 I 1 eb E I 1 |