Show the city is making some fine and ri needed eded improvements on slain blain street between 3rd ard and ath south streets in grading the street the west walk is also to be paved between 3rd ard and esth south streets now that this work I 1 Is being done why not finish the job by paving the east side walk af ac the same time it I 1 this were done it would be a long time before any work was required on these two blocks and tile the appearance ol of the street would bould be improved one hundred per gent cent by the paving ol of the alle east cast walk |