| Show Tunnel for ft UI i Hull lul Creek Colo Coto Nov aEng nears neeri are aft now at al work drawing plans plena and nd estimating the cost coat of ot a n tunnel that writ will wi cut the district about abut 1600 tort teet below bILI the present prent tunnel level at al n a 1 point OMO 01 feet tet above Alv tea sex 11 Dort which will permit the mines on lull Hull Jull Hill tl to 10 tobe be ht wi operated at a I depth of ot about 1004 40 f te feel et I which U la I almost 1600 1 feet tel despot deeper than the bottom ot of the Lilly 11 shaft Ih deepest In this Ihl section |