Show WILL iR DE FINISHED TODAY Great Grell Adit Allt Connecting Conn the th C Mine no And Reduction Works At the offices of ot the tho Newhouse Mines Smelters corporation It I Was 1 learned today that the great Newhouse tunnel not completed lot night as R had har be b n hoped for tor on ac account count of o some slight hitch The power drills dris ar ao pounding away at ta a vigorous rate today tona however and RII the men at It work there are Iro determined to finish up lP I the work before the whistles whiR les blow an announcing In the birth of or the new OW year yeu Mine Manager M r M 1 Is on the I ground and declared before leaving for or camp that he expected to be the first firstman I Iman man to go through the tunnel after the connections aro made I |