| Show UP lilo Itlo Corps lint Icon Neur cur Completes 1111 Correspondence V Iron County Feb rob 21 The party of surveyors who have been IlIen mak making ing lag surveys for n a railroad through h this valley have completed their work anti and have moved south having surveyed urve two roUtes route one running from torn unit field through brought the Ito north field pass pac pacing passing ing IlIg Just north of the residence r of ot Wit Wll ford tori Day and on In by hy way WilY of or Summit Held field the other running through the lap nt at the lie southwest point of ot Lit Salt Lake |