Show 11 WORK IX IDAHO Iron Com puny Will Install ll lurg Iun Plant Of or tho the operations at if J tho the Iron Moun MOlin Mountain loin tain Mining company on river tho the Wol er Ida Idl says t Mr 1 n C l Novin in III company with lIyo and Montgomery hns 1105 just I return from torn n it visit to tho the mines and ami was on his to his homo hommo nt at atI I Ohio lie itc stated slated that tho the plant had hall P been completed and wag Willi running g and Unit hint everything was wall moving like cinch clocH work The electric plant In Is also als In operation oll amid the mines and buildings of or the company ore lIghted by It The drills In the lite tunnel work will be run runby runby runby by electricity Mr Ir evin stated that the raw mill plant Is 18 now running and Is It cutting cui tin timber anti and lumber for tor the thu for tor tho the large reduction plant that the company proposes to Install In inthe the tho summer it In Is I the tl th Intention of ot the company compan to have the tho buildings In readiness to fO that when the roads will wilt permit tho the taking In of ot machinery all that will l to 10 o necessary will bo be to set net U It UIn ItIn ILIn In plaN place Ho lie stated that the company compall proposed putting In n a 1 plant and expected to have hao It In opera operation operation operation tion by Aug IU 1 lIe He Is well pleased with the thu showing mOllo by tho the and antl convinced that they the have lUtO n U great grent mine mineA A great dell deal I of ot work has been heen done dono by the tho company nt at their camp More than 20 buildings have havo been beon erected In Including a ii 1 large hotel and thc have hau In operation one of thu largest 1 stores In III central limbo A has hall also been becu Je n established nt at time tho cut camp up |