Show I 11 IU That Thai Amount ol II Or Oro at nt Utah lne Heady or Shipment The Tim foreman of ot the Utah Ulah Is Hiving neing In getting teams team to haul ore from the tue mine to the tite railroad fhe The late Into cold spell tins hRS caused some seine of ot tire the to lians han up until tire the weather wether moderates A letter received at tire the local bed loo I office today conveyed the tire informatIon that there are re KO CO rO of at ore at ot the tIre mine ready ro pr pe shipment all 11 of which Is high grade It 1 U is apparent train from this report that very ry hea vay o Is being made with wih tire the horse hone hore whim which has hl b been en n depended ewell upon to do o all 81 the tire hoist hoistIng hoIstIng Ing log from coin the mute pending the repair of or the broken shaft Of ot tho tire gasoline on en gine ginI Tire The Th engine will wi be bo In order again In Ina Ina Ina a few tew days and wilt will run along about abut aa as a they dir did dl before Com tho the break breakdown breakdown down Won Vord ha hal has been ben received from Oasis that hint th t the tire teams have started for tor tire the th mine mimic to load up With ore |