Show ORE CONGESTION AT BARFIELD PLANT Great Copper Smelter Swamped With Ores Coming from Various Sources OVERCOMING IMPERFECTIONS 11 1 it Where 1815 Comes ITOI rout That the American Smelting R Be lining company his b cn Staying Is Its out at the Garfield smelter has hns not been generally known knon Never Neol Nevertheless such has been heon the and according tb I a well known mine oper at r who the smelter town out In the western of Salt Sail COOn tI I a bad ot of ort oro con exists there II at the time Right the tho tune the groat Wa first In so Si tIm mining man mun saYI says things have tot rIot rIz There han been constant trouble for tor General Manager and his assistants who whip hn hava hail to make muke many changes In order to overcome ImperfectIons Or oC the design designore ore ers ot of the tho plant The ho work vork of recoil is 15 yEt incomplete It wi probably bo be some somo l little I 0 time yet el before everything lu and the plant becomes a COl complete lele metallurgical suc sut ceLs IS However good headway Is ho ho hoIng Ing mAde Ono ot of the tho ments II I In the tho mil mill which was de designed lii handle tons of at atoro ore oro per 1101 liLy iUt during the tho late wet et spul ores orel brought In were Iera thorough thoroughly ly iy soaked wih with water and nd according to front 1 a source It has hus been owing tl to certain mechanIcal to pitt through daYi may moro more 20 per cent ot of the tho tons or only tons per ler 1 a Then Thun there was trouble with one f of tue tho converterS converter besides difficulty wih with ono one of the tho big roasting furnaces ox ex last week which seriously l operations Under the conditions the smelter has had moro inure than It could attend to wilI with the Utah Copper Boston and Utah CO keeping Iii the production It waa said b by the tho NeWs Informant today that there thoro are over oer car cara of at ore In the tho sampled smelter yards IU tl that have not been |