OCR Text |
Show mission, a, , faith and a awarded th and furnish t te, as required i6Ct w'auT Any ar1, "Hi, STATE RJV Hentj. j ( 1060). The State Highway Department, Depart-ment, in accordance with the the provisions of Title VI of the Civil Rights Act of 1934 (78 Stat. 252) and the Regulations Regula-tions of the Department of Commerce (15 C.F.R., Part 8), issued pursuant to such Act, hereby notifies all bidders that it will afiir.-natively insura that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination dis-crimination on the ground of race color, or national origin. Proposal forms, plans, and specifications are on file in the ofiiee of the State Road Commission, Com-mission, Salt Lake City, and the office of its District Engineer En-gineer at Cedar City, Utah, where they may be reviewed by prospective bidders. Specifications, Speci-fications, proposal forms, and plans may be obtained only at (he Commission Offices at Salt Lake City, upon application and payment of a fee of $5.00, no part of which will be refunded. re-funded. Each bidder must submit a bid bond from an approved surety company on forms provided pro-vided by the Commission; or in lieu thereof, cash, certified check or cashier's check for not less than 5 of the total amount of the bid, made payable pay-able to the State Road Com- NOTICE TO CONTRACTORS Sealed proposals will be received re-ceived by the State Road Com mission of Utah, Room 603 State Office Building, Salt Lake City Utah, until 2 o clock p m Tuesday, July 22, 1969, and ,t that time publicly opened trr construction of a Road Mixed Bituminous Surfaced Roadway in Beaver County the same being that section of State Road No. 21 4-plus miles South of Milford, identified as Federal Aid Secondary Project No S-0352(8) 1st Contract. The length of the road to be constructed or improved is 0 201 miles, and the principal items of work are approximately approxi-mately as follows: 720 tons of Road Mix Mineral Aggregate, 2000 Cu. Yds. of Granular Borrow Bor-row and 1850 Tons of Untreated Untreat-ed Base Course 1-in. Maximum. The project is to be completed complet-ed in 20 working days. The attention of bidders is directed to the Special Provisions Provi-sions covering subletting the contract. In conformity with the Federal-Aid Highway Act of 1968 the U. S. Department of Labor has certified the wage rates for this project which are the minimum min-imum wages to be paid on this project. These rates are made a part of the contract documents. docu-ments. The attention of bidders is directed to the fact that this Commission has been advised by the Wage and Hour Division, Divi-sion, U. S. Department of Labor, La-bor, that contractors engaged in highway construction work are required to meet the pro- visions of the Fair Labor Stan-j Stan-j dards Act of 1938, (52 Stat. |