Show NOTICE TO WATER USERS state engineers office silt lake city utah february 9 1910 notice 13 hereby given that N T porter choso whoso post office address is salt lake city utah lias made application in accordance with the re of the compiled laws of utah 1907 as amended by the session lawa of utah 1909 to appropriate thirty 30 cubic feet per second of water from virgin river washington county utah said water will bo diverted at a point winch beara south 85 degrees 14 minutes west feet distant from the quarter corner of section 21 township 41 south range 12 west salt lake biso and meridian from where it will bo conveyed by means of a canal for a distance of feet and there used from january 1 to december 31 inclusive of each year to acres of land embraced in sections 1 11 12 and 13 township 42 south ringo 14 west sections 5 8 9 15 16 17 18 1920 and 21 township 43 boubli range 14 west salt lake base and meridian in addition to the quantity of water above specified applicant intends to appropriate five thousand acra fact of water from said river at the point of diversion above and convoy it bv means of a cinal for a distance of feet and there store it whenever available during alie period from january 1 to december 31 inclusive of each year in a reservoir embraced in sections 16 17 18 20 and 21 township 42 south range 13 west salt lake base and meridian the water so stored will bo released whenever needed during the period from january 1 to december 31 inclusive clu sive of each acar and conveyed by means of a canal for a distance of ctet and there used in the manner and for alio purpose above described tina application is designated in the state engineers office as no all protests against tho of slid application stating thereas ons must be made by affidavit in duplicate and filed in this office within thirty 30 days after tho completion of publication of this notice CALEB TANNER engineer date of first publication february 17 1910 date of completion of publication li 19 1910 |