Show Bridge Loss Totals At Duchesne Ralph Halstead of Duches- Duches Duchesne ne County Commission has reported that total damage to private and county bridges on the north fork of the Duchesne Du- Du Duchesne chesne River during the June 16 flood was The appraisal of damages is the first step In replacing the bridges he explained TODD AND Horrocks I Brigham City engineers combined com com- combined the report which has hasI I been submitted to Gov Geo- Geo George George rge D Clyde Mr Halstead said that priority is being given to Lewis Bridge at Tabiona Bridge and Sand Creek Bridge The Commission also Is con con- considering construction of a temporary bridge crossing above Hanna to allow access to the west side of the Du- Du Duchesne Duchesne chesne River THE APPRAISAL was bas bas- based based ed on foot 50 spans 16 to 20 feet wide with cement abutments abut abut- abutments ments Load capacity would be 50 tons to accommodate logging trucks from Tabiona and Hanna sawmills |