Show 25 Million Asked to Give CUP Push Major Maior I ISen Sen Wallace F Bennett R utah has asked Interior Secre Secre- Secretary i tary Stewart L Udall to give the Bonneville Unit of the Cen Utah Project a major push this year by providing the program with 25 m r million inthe in inthe the next budget In Th The request was contained in ina a letter to the Secretary So that no valuable time is lost in the timetable We will need at least that amount of money the Senator said The funds would be used for continued construction of dams and tunnels for the complex unit On December 4 a 55 m million contract for construction of the Water Hollow Tunnel was awarded for the longest of a three section tunnel So that the other two two tunnels ls can be completed at atthe the same time liS as the first a very close e tm time timetable table must be followed a and d there must be no Sen Bennett said In addit ion the enlargement of the ui completion of t the o odam dam and the other phases of the project are all timed and and al geared together In an intricate program design designed d to pr provide vide the people with water in the Uintah Basin at the same time moving the additional water to the Bonneville Basin |