Show Contract Let For Surfacing Sheep Creek Contract has been let by the Bureau of Public Roads for the final surfacing and the con con- construction of a steel concrete bridge over Sheep creek on the Green Vernal River highway Utah 44 according to the Green River Star THE CONTRACT will cover the final surfacing of the road in the canyon above the Ben Ben- Bennett nett ranch and a permanent bridge over the creek Remaining to be surfaced be- be between between tween Green River and Vernal and Green River and Flaming Gorge dam will be less than a amile amile mile of road which was ed cd after the fatal 1965 flood but which has never been reo re- resurfaced surfaced This is outside of the forest boundaries and to be completed sometime by the Utah state road commission |