Show schools are renovated i for opening hopeni ng most of the schools of the county will have a new look when students return to their classrooms on september oth according to supt bupt H 11 M lun d dell doii e 11 improvements ranging from new floors or painting to complete renovating renova ting jobs have been given many of the school buildings at the central school a side entrance to the school lunch kitchen on the westend hestend west end of the south wing of the building has been made the entrance makes it possible to trails tralis transfer fer stores to the kitchen and also atso serves as a safety precaution in case of fire at naples new floors have been laid in all rooms of the north building one room in jensen has also received rece ived new floor stairways arid and worn places fc I 1 in the maeser school i have been repaired at avon avalon the kitchen has been painted walls of buil bull building dirig cleaned and rooms covered with Cello ceilo tex where plaster was broken rooms and kitchens at tridell and lapoint were also repaired in this manner in all schools where outdoor toilets were used these buildings have been repaired and painted some of these buildings have never been beeri painted before desks at alteria high and ava ion lon on have been resurfaced and varnished at the uintah high several rooms which had not been painted since the buil bull building ing was taken over by the district in 1923 are being redecorated district repair crews are working to capa capi capacity city to get all the repairing and ayd aid aad a ad redecorating completed jor the opening of school work work of shingling the old central school building is ex pecked to get londer under way this year when the hew new central school building was completed there were four spare rooms in the new structure complaints were heard from some quarters that the build big hIg was too large and plans were made to have abl e old building torn down with wit labor but this program was 5 discontinued and the old structure left standing last fall a pas ras passageway sa goway was constructed to connect the up continued continue on page 8 SCHOOLS ARE RENOVATED FOR ron OPENING continued from paco pago 1 per floors of the new and old id buildings and to serse serve servo W as ai fire precaution the lowe lower floor of the tile old central school building Is now used by the county LI and imd the employment service buses of ite tte ho ile district arc are in bt better ater condition than for man many manx rears years vears years according to mr Lun nun lundell deir the 17 bused and 2 reserve lures buses will transport from 30 to 00 60 passengers each terrance linfell tie th 0 new flew principal nt at alteria Al terra Is atthe at the school to take eare care of students who wish to get transcript of their credits or to take tike care of other busi busl business riess said tile the superintendent tetide nt mr hatch Is from smithfield where lie fie wa was s assis tint to tile the principal in the north cache high school and director of student personnel lie lle hns has a masters degree in school administration an art additional first grade will be held at maeser school to take care of tile tiie he 57 students who are expected to register for this de |