Show 1 wafer ater system T aid F families amiliea in maeser area opportunity plus an impending water A shortage has spa sparked rk a new concrete water I 1 system t that at will serve 13 families in the maeser area ithe opportunity came in fhe shape of about a anile of old 12 in cement ppe pipe that was abandoned by vernal verna city CAty an tAn additional feet of 12 ln pipe was added addea plus a flume for a measuring device and other necessary apparatus TUO the start where W water ter Is diverted out of the upper er canal near the murray i lateral continues east to the residence and ito to the arch A Uc McC onUe Conkle residence a T among m ong colad the e 0 other er Os served wm be morgan merle merk ley adrian raines and rowena richens Rl Iti chens participating in the cost of the program and aiding wl with th engineering plans an a Is s the soil conservation conservation service ife mit J FT far C one 40 0 of 16 the great advantages 3 aw kaj of the new water system is b that it will practically eliminate seepage and alion and speed the conveyance of water under the old ditch system A li it could take at as long as alar arp hags hours to pevey the water fro the he head d of the 40 dach to the end of the line and often the amount of water was insufficient to carry it the whole length with the new pipe water could run the whole length of the system in about ten minutes and even when the water Is short it is able to travel the whole system time and arduous ditch maintenance also is evol avoided evolved ded the pipeline will accommodate up to five second feet of water ft A A Q 4 q N 19 40 aa 4 V 4 4 k 44 L 1 0 1 4 ka fi NEW WATER SYSTEM Insi installing Alling 12 inch co conar ncr 14 atoo pl in a new orn in maer are ar left lal juno jun Mor kleyo in th ditch ch liui IN akhurst drain hadrain WA rain and elmor lind and inc I 1 |