Show flaming gorge highway folkway 11 1 0 bids 1 4 expected soon bids will be opened for two highway projects conn connected opted with the flaming gorge dam construction this spring and summer the bids will indol involve 4 e rebuilding a part of wyoming and constructing in 14 the lucerne recreation area of flaming gorge reservoir i r J 11 walton bureau of reclamation project engineer for the huge upper colorado river project dam on the green river sold said the wyoming contract involves re routing the south end of the highway and raising a bridge over the Blacks fork river 15 13 miles south of here the bid invitations will be issued in june mr walton said four miles of new high way will ba built and tho bridge raised 15 feet harlocker Car locker johnson national park service project manag er for the flaming gorge reo creation area said bald the lucerne recreation road work would be contracted this summer the road will extend from wyoming ng about 40 miles south of here eastward to a point over the planned reser voir the route is on a bench north of the present dutch john access road between linwood and the green river V |