| Show WILL BUILD ATHOL CUTOFF t U P 1 Will Avoid A 11 III Steel Ull Hili Between and 11 CI Cheyenne Wyo Wyn 0 May MU 14 Telegraph Telegraphic ic Instructions have been received here hOlI hereto to 10 resume mo nt at once tho thu building of ot tho Athol cutoff on eu tIm tho Pueblo railroad between Cheyenne and 1111 Den Don Denver Denver ver 1 Tho The contract amounting to 11 te about was lot let some ome months month ago and soon loon after work began It was nH ordered ol re discontinued The Tho cutoff Is la built to tn avoid Mold the steep Steel grade over o r Athol hill hili hilland and will reduce the tho time limo of or trains be between between tween the two cities |