Show state road approves approve S in utah state road Co commission mints monday approved a road project in cooperation with the bureau of reclamation for realignment of state road 34 around the Stel reservoir orea area the commission will pay 1 of the cost of realigning utah 34 and the bureau has agreed to pay the realignment Is necessary sary as when tile the reservoir Is filled the present road will be inundated the ilia project li divided into two portions the first part covers 2 3 miles within the limits of the reservoir and will provide a 22 foot roadway with a 6 inch gravel surface the other stretch teli will be 3 7 miles toward est boundary and will be a 28 20 foot roadway other roads ot of local inter est that flint the state road COMI coin 1 mission Is planning include duchesne county line to vintah river uintah county 7 2 miles oil U 8 40 at a cost of castle gate carbon coun 1 ty tv to duchesne county line eight miles 09 on U 33 at a cos cost i of AltA altamont to bluebell niu ebell and altamont Alta tonah alio seven bevon miles milea on oil U and U at a cost of i 1 |