Show 0 4 1 deduc I 1 I 1 of 0 ft pit am aga 1 ga 10 0 9 1 W R 10 A telegram was received in th tins a 1 city by ax l ix mayor samuels from D P S coke announcing the success of tile the new process which will be used by the ct dar butte oil OH co la in their new plant which will be erected at al whiterocks Whlter immediately tuesdays bait lako lake Ir ioune says alter exhaustive e experiments coy cov pj ng A period oi 01 several the ot of tile the lectar cedar butte oil oh that a tui pr process lor the extraction ot of oil irom oil las has been ue anu and tuat are beius prepared tor for a guv torl lon plant to be on ua its hoi holdings dinga near white locks la in the utunah uintah busan la in lon ion bean with tue lae y p aut tor for the dolid al 41 ol of oil from tile the sands the com coal lany if ny al atao 0 o plans a re renning lining yant employ tug the nu improved proved lu pro leia whim la is tu to ia be liu aau ul OL ol 01 tile the lou erdl ol oi the pluna ol oi the lat tiiu md d pi ui u piu taba ur mr tuu tuo baltus ous laue uBie ruay liy by ur air 1 I 6 buu cube a JWJ UL oi lao cuir WOW jjr dr loue laub lit boiu boi u 11 in III WILLI lao beut ul ita it A hat the wa iu cooperate iii m the ihfe to 10 fia trease tuo lao oil ol 01 lae uy by au u to abbitt in me lae brei reLt licu lU 01 0 the re lining plant and the anatalia tion ot oi tile the im improved proviA hitt hittmann mana truL racking klag lu in yiew view ot of the flet that the pro less lor for the treatment ox ot the buus has been perfected and tesley out t ihu he patst low lew baya ur dr loae oae is oi oi the opinion that approximate i ninety days will be necessary to prepare plans tor for the big plant obtain aida and ancl ass assemble embie b I 1 bilut basis he that the plant pio klio babiy will be ready lor oper operation aLion L ui late summer or early fan fail pre ire i work however hoever already la Is antler vay may aud and the foundations for the plant are now being put in ihlia accurate figures as to costs have not et been obtained it Is ia estimated that the treating plant arid and the refinery will represent an expenditure ol 01 a approximately SU jUO OU ahe peri eLtion ol oi tue lae process and the erection ot of the combined extraction and refining plant by the ledar cedar butte company combine to torm form the nucleus ot ol a new industry la in utah the cedar butte controls approximately acres ot of oil lauds and oil sand lands in the uintah basl basin n but other than perfecting titles to the drilling lands all efforts tor for the time being are to be concentrated on the development of the 1000 acres acrea ot OL saturated oil sands tests made by the miniature plant plaint at the university and by various chemists indicate that the sands bands controlled by the cedar butte will yield an aver average age of at least twenty five gallons of crude oil to the ton of sand it is probable that the yield may be greater as the deposit is penetrated under the process evolved jt t Is conservatively estimated that the cost of production will be approximately one cent a gallon or not lo 10 exceed 60 cents a barrel after the erection of the plants practically all the expense will be that of miu ing as the solvent Is replenished automatically the sands are in mammoth ledges and represent a quarrying proposition rather than mining the oil produced Is of high gravity averaging about 30 baume under the cracking process to be used it Is believed that the oil will yield from 50 to 60 per cent gasoline the I 1 he ton plant is expected to produce approximately gallons of crude oil a day and this will yield gallons of gasoline or better the residue will be used tor for fuel and for road hinder binder for which there Is a demand in the basin in connection with the extensive road building activities with the market lor for the road binder created it Is expected that the revenue thus derived will cover the expense of operation at the present time burng during the summer mantl s there are approximately gallons of gasoline consumed in the uintah basin dally daily tho the ton plant Is designed with a view to supplying the basin demand tor for 95 9 gasoline 5 oil ne and at the same camo time provide for an anticipated increase which it Is believed will come this year with the great oil development expected in the uintah fields |