Show THE MOFFAT ROAD work tn in egella canyon I 1 10 0 be Resu resumed nied on a large scale in near future construction work on the moffat road is to be resumed immediately and upon a large scale in the egeria egena canyon the officials of the road declare that trains traina will be running into yampa and the oak creek coal fields before next summer steel rails are now being laid through gore canyon and by the last of this month the line will be opened up to yampa siding riding ten miles from mccoy and thirty three miles from yampa in commenting on the progress of the construction work the yampa leader says all of the most difficult portions of the construction will have been passed when yampa is reached and it its is expected that from this point on west to salt lake city the road will be built very rapidly general manager W A deuel and chief engineer 11 II A sumner were in yampa wednesday night of this thia week on their way back to denver from a trip to vernal utah I 1 taken with a view to determining the exact route of the line which had not been definitely established deiy far be yond craig in tills this county |