Show 1 Receives lt Suggestions The Stitt engineer gives a jI of the work done in Imis department si 4 during the period and the and needs of the office for 4 the two years Jn my previous jc J called time attention of tue il to the heed of push o lug thu river project through man Hocus possible for the purpose of ap plyIng law a sates ground for its permanent operation It lime alto of the to H carry out this suggestion but owing to condItions the Work i been than had boon hoped is non doubt that ito far as time r vork hiss progressed it hia been safe ly swithin the provisIons of the law muStS stool subject to the attacks that could ho made on work done hastily and in 1 considerately 4 For the out of the present plants of lie state engineers up jt of tIme salary will be nit does not Include the mci dental work vill probably hi Called for In order that jJ the on time Weber river system 4 bu pushed forward amid the law be fully tested by it 3 strongly urge the appropriations rocked for be grunt rt For certain dIfferences still exist between the arid time farmers in lom th waters of th time clearing away of theo differ dices awaits a of the law |