Show moscow has high I 1 grade zi zinc nc relative to tile tho newly dis covered zi zinc nc deposit in tho the moscow mine of beaver whick has haa been referred to in these columns suat supt G S wilkin bald yesterday that lie now has ed ad it so thit that thero there is a areat of commercial ore measuring up tip 10 to 15 feet ile ho estimates ore in sight and probable samples from this deposit carry 5 6 t CO 50 per cent cant zinc ounces of silver 3 per cent lime 67 silica and 36 35 per cent load lead As broken tile tho ore samples 50 a ton this is sold 0 to o local agencies and the company gets get 4 this priceless price less tile the freight rate to tile tho mississippi smelters shelters sm elters of a ton this ore body is on the level of the old workings it Is is between the no 1 and ana no 2 shaft it will afford about feet of backs on tile the surface the vein outcrops strongly but had been neglected up to a few days ago now with a strong spelter market mining this grade of ore will bo be pushed jor all it is worth mr wilkin is now up making contracts for tile the selling of this new kind of oro oro the moscow lie ho figures that lie ho can produce with power drilen at least a carload daily of commercial grades and much of it will be high hibb grade where anere tha ore was first noticed anthe on the i level 0 ver it if w was a i fo four u rheet feet wt wide ido I 1 tac t ts 1 now ten feet thick has been followed fifteen feet on the strike and no hanging wall is f in sight at present the ore is bloing booing dropped to the level and I 1 hoisted to is t a d t through h rou gh ti the I 1 a 0 old I 1 d shaft this can be ba simplified with a little more development work I 1 right now no lead silver uro bra ip i being eh shipped wea from the moscow on account of the installation of a new electric hoist at tho the cullen shaft this shaft is to tile the level and will be carried to the 1108 1100 or feet deeper it is the expectation to have the new hoist in and the sinking resumed about november 1 the caca excavations excava batons tons are all completed and the concrete is being poured for the hoist foundations republican |