Show to improve city streets county road commissi commissioner over thiessen came in on monday from an inspection or of tho the state road north and south bouth on which work will begin within a week or so eo he expects to put a large number of men and teams to work as soon as they ahn cnn be secured from the form farm work the work that will be dono done this fall fal will include the grading ct cf main main street from the north to the intersection of ath street west on oa the county road and south bouth from the intersection of I 1 and ath to the south county lino line the city will probably be ba required to move the tight light poles and the telephone company will havo to move their lines to tile the side aide ot of these in order to get at the best results loj oad building it is proposed to give beaver beater the best streets it is possible to make with native material |