| Show KELSEY STRIKES BACK Declare JI Company Was Wa for City ell Kelsey does lIllIS not 1101 agree the nah Itah In Its charge ch r l that thai his Is re for Cor the delay dIa In the Ihl instruction In of or cement cm nt sidewalks throughout the city Ill The company In a letter to 10 the boar l lof of public works charged that the work delayed the engineers lid did not furnish the IIII grade staked when needed and that Ihal the work had stopped because tho Iho engineer elu I cr had held up u estimates for Cur work already done until the city ell the tho company nearly HOMO Mr Ir was wall not 1101 present at III the meeting when hell the I he letter Jt 1111 wild mid hut but upon hl hi return has hs made the Ille statement that the company gut gul Hilke ns aM rant us 1111 needed He liE nUo wild that Manager Thomas fL ens of lit the company told him personally that hh hl to get II out of oC wn II Imel with the Ih city ani an that If It could not be done otherwise the company would forfeit 1111 bond In the sum Hum of oC Another remain for tho Iho delay In III work Mr Ir says MI Is the fail failure Ire ure of oC the company to III do the necessary grading so 50 Ihal the Ihl stakes could nuM he be properly sot fOci In III many Instances In he h laid that thal his men would have hac to 10 till dig holes a n foot Coot and a n halt half deep In order to set the ut lit the proper grade |