Show CONGRESSMAN COLTON SAYS CASTI CASTLEGATE DUCHESNE GATE ROAD nOAD IS GATEWAY TO THE TIlE BASIN The state road commission agreed to keep keel open tho the Castle Gate-Du- Gate chesne highway for mail mall trucks and other travel during the winter The matter was taken up with the commissioners by Congressman Don B B. B Colton J. J T. T Tullis a superintendent superintend superintend- ent In the postal service headquarters headquarters head head- quarters at Price and Frank Davis Mr Tullis' Tullis assistant Congressman Colton explained that the postal would not be able to bear the expense of keeping the tho road open next winter as it did last year rear He pointed out that the road Is the gateway to the Uintah basin At a meeting between Joseph F F. Peterson chairman of the Sevier county Bounty commission it was agreed that a location party should be put putto putto putto to work in the near future on the proposed road between Richfield and Salina a of seventeen miles and md that differences of opinion regarding regarding re- re garding the kind of construction be after the survey has been made Hade State road commissioners and md engineers of the th-e federal bureau burean of Df f public roads favor a gravel surface surface sur- sur face ace road and members of the county county coun- coun ty y commission are of the opinion that Hiat the he the stretch should be of hard surface surface sur- sur face ace material |