Show Present Indications are that tha the tho convicts will be delayed on the work in the Price canyon for tor a n week or two yet The floods mentioned balow below below be be- low have work worked d havoc with the railroads and the wagon roads as wellIn well wellIn wellIn In the meantime the big road builder build build- er is doing fine work It will almost build a road at one trip over where tho tiro soil is free from rocks s. About twenty men with te teams ms are makin making a big change In the r road ad about Whitmore Whitmore Whit Whit- more park It Is likely that before before- fall the road will be bo ready for tor travel S |