Show R. R ENGINEERS SAY S ROAD LOAD WILL BE BUILT Oregon Short Pine Line Salt Lake Route and Orem Lines Heads Of Engineering Departments Make Trip Together From ProVo Probo Through Uintah Basin Boundary Line Should Go To 0 Supreme Court When the matter of settling the Duchesne boundary line is done it will be by a suit commenced in the district court and then tc carried car car- ried up to the supreme court During the former part of the week someone someone heard that someone someone else had said that it was reported that the matter was being submitted to the supreme court for settlement on ona ona a statement of facts being prepared by the attorney general and the state engineer and a subscription of 50 50 was proposed to engage E. E D D. D MacDougall MacDougall Mac Mac- Dougall to look after the case Of course course there was nothing to the re report report re- re port as was vas evidenced later In the week by a letter from a prominent Salt Lake attorney who interviewed Mr Barnes regarding the rumor A portion of the attorneys attorney's letter follows fol fol- follows lows Attorney General Barned informs me that he has written to some of the officials and those interested in inthe the reservation saying that it willbe will willbe be impossible to file any stipulation with th reference to arty ariy statement of facts with the supreme court and that he recommends that an action be started in the district court fry by bya frya a taxpayer of one of the two counties counties coun coun- ties Involved and then the matter can be brought up regularly to the court It It is his opinion that be 4 impossible to bring the matter before before be be- fore the supreme court without submitting submitting sub sub- it first to the district court either in atrial or of facts The attorney also inquired of the clerk of the supreme supreme court and found that no such stipulation has Leer filed fled |