Show Heating Heating- System To ToBe ToBe Be Installed In Band Building Material for installing a heating system in the remodeled Fruitland school chool building which is being used as a music building for the Duchesne Duchesne Du- Du chesne high school was ordered Wednesday of this week Lee Holdaway of Heber City who has been jeen employed to take charge of the he Installation will return to Duchesne Duchesne Du- Du chesne Saturday to begin work he stated after an inspection of the building N N. Y A A. boys will help with the installation Radiators will be Installed which will be fed from the main boiler of f the high school They will be of the thc standard cast iron type typo without without with- with out ut fans or motors to create any disturbing noise Some of ot the them m music sic classes have been held inthe in inthe the gymnasium because of recent cold old weather and it is hoped the system can foe Ibe installed and In working order in a short time |