Show Reclamation Engineer Engin er Inspects Moon Lake H H E E. 0 O. O Larsen Larson Reclamation Service Service Service Ser Ser- vice Engineer of Salt Lako City was wa in the Basin over the week weekend weekend weekend end making a final inspection Uon of the reservoir site at Moon Moon- Lake Test pits dug where the dam and spillway are to be bo built were the main points of interest While we have been unable to lea learn if any decisions were mado by Mr Larsen it is assumed that this Is his final inspection and that all details will be completed within the next week or ten days and that bids for advertising will willbe willbe willbe be out at that time Mr Larsen is expected to return return re re- turn again shortly for an Inspection inspection In in- of the proposed route for forthe forthe forthe the Duchesne River Exchange Canal to cover the Blue Bench The building of this canal to Include in In- include in clude elude the Blue Bench is held by many to toas be as aa important as the construction of the Moon Lake reservoir itself and great hopes are held out for Mr Larsen's Larson's approval approval ap ape ap- ap of the J j |