Show NOTICE TO contractors the board ot of education ol of the too ele high school district no 1 county utah will receive sealed bids up to 11 a in monday donday february 3 1913 at the office of J W tate secretary tooele thoele city utah for furnishing all material and labor necessary to the complete installation of the system of plumbing heating and vent ventilation anti certain other piping in the high school building for said district now in course of construction in said city said bids will be publicly opened and read at af the above time and place the plans and specifications cove i r ing the work to be done have been I 1 Dreva prepared red by cannon fetzer architects and can be inspected at their i office templeton building salt lake city or at the office of said sal d J I 1 W tate Secie secretary tary tofele tooele city utah each bid shall be in ink or typewritten and shall be accompanied by a certified check on some well known bank for at least five per cent 5 of the amount of the bid submitted payable to the order of the board of education tooele thoele high school district no 1 the amount called lor for in said check shall be forfeited to said board of education if the proposal is accepted and the work awarded and the bidder then falls to enter into a contract according to the t arns of his proposal within six days after being notified the contractor will be required to give satisfactory surety bond to the said board of education for fifty per cent of the contract price the right is reserved to reject any aad aim aa lr r BOARD OF EDUCATION TOOELE HIGH SCHOOL DISTRICT NO 1 rocele tooele city utah by C R MBRIDE president J W TATE secretary |