Show Engineer Tells of Progress During First Month Work Recently appointed City Engineer Engin eer Davis Holder submitted to the City Council Tuesday night nighta a progress report on engineering work accomplished and outlined for the future during the month of February in which he e announced ed the commencement of a survey program designed as a basis for fora a new map of Moab of facilities elevations and ments m Mr Holder spent the early part of the month becoming familiar with the tha city and its facilities with the aid of department heads eads and County Surveyor Hub NewelL New New- ell ll He lie reported that o on Feb 16 10 a survey had bad been Initiated to determine the location of all sewer sow sew er Cr lines water lines Unes tire Ire plugs as well as courses and distances between official city monuments which will be established at strategic stra atm locations throughout the city Mr Holder reported also that t at elevation surveys have been run from the center caster of town to the tha two reservoirs south-east south of town I and to Springs on the north Bench marks have been at one block Intervals inter Inter- vals vats along the th route St so 60 that accurate accurate accurate ac ac- ac- ac curate elevations may Play ba bt transferred transferred trans to the official monuments when Installed I Design data Is being accumulated ed ad for the improvement and enlargement enlargement enlargement en en- enI I of or the present water I mains and the sewage lines A I street by survey has bas as been I conducted to determine l fire lire demands demands de de- de- de mands mandi and water mains will be planned which coupled with add add- jd ad d storage will win supply that de de- nand mand |