Show Oil Development Notes The M. M G. G M. M well on Cane Creek dome was In last week weekend week end to word received today hole hoie is being made Plans are going forward to plant surface il pipe C at around feet some time tomorrow Friday All machinery that has been expected Is now here and will wUl be taken to the well well- site In the next few days Chet Garlinger superintendent of the operations stated that the drilling machinery Is all working work lug ing very satisfactorily He lie also stated that during the past ninety days over tons of heavy machinery have been transported down the Colorado river In barges unloaded there and trucked up a steep canyon toad road to the well To persons per sons who have seen the work done it ft seems almost Impossible sible The company has had more than their share of trouble trou ble transporting their machinery machin ery to their well site but feel that It will be more than worth their trouble Mr Garlinger stated this morning that barring any serious mechanical troubles trou bles ithe the first horizon of 2500 feet teet should be reached in short order lie He feels eels very fortunate in having obtained a very competent drilling crew and anticipates good progress in the future Big ig Flat Structure j The Glen Ruby well on the big flat IS U now shut down at feet Work wilt will resume as soon as a 4 rotary drilling rig is moved into replace the cable tool toot outfit Mr tr Ruby stated that I he thought that work could re reI resume I sume in about two Wo weeks |