Show LATE developments in the OIL FIELDS utah southern oil company utah oil refining company prank no 1 cane creek dome section 6 27 21 discovery veil of moab district shut in john L shafer no 1 A section 36 2820 28 20 the first flank well on cane creek dome half mile north of discovery well bottomed in amey shale at feet drilling crew went down river from moab wednesday to resume operations eight inch casing will be run to bottom to effect shutoff of water before drilling deeper casing will be cemented king no 1 salt valley structure section 13 23 20 after fighting cavey hole for several weeks without being able to make any headway operations have been suspended until string of 8 1 4 inch casing can be delivered to location and run bottomed at feet in conglomerate shale formation navajo petroleum corporation state no 1 cisco dome section 2 29 21 after getting a good showing of oil and gas at 2811 feet a gas stratum was struck at 2900 feet and salt water at 2965 feet this Is to be cased oft and drilling to the salt wash sand resumed where it Is believed there Is a good chance to get oil production boulder knoll oil gas company endter no 1 boulder knoll structure section 17 34 25 bottomed at 2640 feet on top of sand which has been producing a strong j flow of wet gas for over six months operations on test were resumed this week hole is being under reamed and 8 1 4 inch casing will be set to bottom to shut oft water before drilling deeper petroleum corporation well no 1 barrier creek dome section 16 27 16 drilling below feet in shale with hole full of water eight inch casing will probably be run crescent oil syndicate mccarthy no 1 crescent dome section 27 21 19 drilling below 1625 fret preparing to n 11 8 1 4 inch casing western crude oil company preparations pa rations being made to spud in test well on cisco springs structure ten miles north of cisco town national rig at location continental OU company well no 1 boundary butte structure section 31 24 21 drilling in pennsylvanian Pennsyl formation below feet and drill is believed to be nearing th stratum where large production was erea in well no 17 on rattlesnake structure three weeks ago continental santa fe companies rattlesnake no 17 section 2 29 19 rattlesnake dome new mexico a short distance from the southeast corner of utah which came in three weeks ago with production from penn syl sands estimated at 1500 barrels at a depth of feet with well capped and small flow line running to tanks to relieve pressure so that under reaming can proceed Is making more than barrels of oil alth water under reaming Is progressing satisfactorily but progress Is slow on account of the immense oil and gas pressure it is estimated that two months will be required to set the casing on top of sand and cement it to shut oft the salt water |