Show LATE developments I 1 in trie OIL FIELDS sati 60 MOAB OIL FIELD DRILLING REPORTS utah southern oil co consolidated soli dated oil co frank chafer no 1 cane creek dome section 6 27 21 discovery well of moab district preparations being made to resume pumping of oil a heavier string of pump rods now being run well Is showing a great deal of life and it Is believed that with resumption of pumping it will produce a greatly increased flow of oil john L shafer no 1 A section 36 2620 26 20 the first flank well on cane creek dome halt a mile north of discovery well drilling thursday at feet in very hard limestone being operated on tower oil from discovery well being used for fuel A second flank well to be located still further out on edge of dome will be drilled in the near future A tentative location for a tesac ot salt valley anticline also considered a salt dome has been made in the SW of section 18 23 21 moving in of drilling this month this well will be drilled by the utah southern oil company with the moab consolidated oil company and the utah oil refining company operating cooperating co utah southern oil co canyon no 1 east anticline section 16 41 19 a diamond drill test last report was received from well march 4 and gave depth at 1785 feet in limestone present depth should be well under 1800 feet as good headway Is being made embar oil co p alg six no 1 moab anticline section 34 25 21 pioneer well of moab district drilling temporarily suspended at feet but will be resumed within few days bottomed in sandy shale with a showing of oil in evidence texas production co shapley no 1 sweetwater structure section 5 27 14 still tied up with fishing job lost tools were raised eight feet and are now wedged there green river thursday with additional fishing tools with which it was hoped hole could be cleared depth is 2993 feet 0 in coconino sandstone petroleum co aeu no 1 barrier creek dome section 16 27 16 water line to camp being laid and other preliminary work under way road to completed thursday and heavy equipment now being moved on to location erection of rig to start within a week or two boulder knoll oil gas cowell co well no 1 boulder knoll structure section 17 34 25 shut down waiting for roads to dry out so that string of inch casing can bo moved in bottomed at around 2300 feet sand the first objective should be encountered within feet crescent eagle oil co well no 1 crescent dome section 4 22 19 shut down at feet hole has been making small flow of oil with water for over three years announcement was recently made that pennsylvania oil operators had taken a lease on cres cent eagles acres of land surrounding the no 1 well and would immediately put down a deep test with a standard rig to test the oil and potash possibilities work it is expected will start during march oil Refi while thesel companies have ceased active drilling in the southeastern utah district they retain extensive acreage and operating interests and are prom moab consolidated soli dated oil company recently organized to operate cooperate co with the utah southern oil company in drilling a number of salt dome tests in the moab area the midwest utah oil refining interests have several rigs and strings of tools at moab and vicinity and it Is likely that they will start further operations in the spring general petroleum paradox colo anticline location spotted for fourth well which will be on flank union oil co of california this company Is scheduled to start its second test well on lisbon dome 40 miles southeast of moab early in the spring the new test it Is announced will be on flank of structure |