Show NOTICE TO contractors sealed proposals for the completion ol 01 shower and toilet room for star hall and miscellaneous repairs for high and central school and installation ol 01 plumbing for star hall all of moab utah will be received by the board of education of grand county school district at moab utah until 10 0 clock a m on the ath day of july 1928 separate plans and specifications have been prepared and proposals will be taken a for the completion of shower and toilet room for star hall and miscellaneous repairs for high school and central school and b for installation of plumbing system for star hall proposals shall be submitted for each of the two classes of work in accordance wilh the plans and specifications prepared by W E ware architect which plans and specifications may be examined at the office of C A robertson president of the board moab utah and at the office of W E ware utah savings as trust building salt lake city utah all bids shall include all work complete as per the respective plans and specifications for the character of work bidden upon bond to the full amount of the contract price conditioned that the contractor will properly perform the conditions of the contract in a faithful manner and in accordance with its provisions with sureties satisfactory to the board will be required on the contracts as awarded A certified check of not less than five per cent of the amount of the bid shall accompany each proposal which check shall be made payable to the order of the board of education and the check of the successful bidder will be forfeited in case ho falls or refuses to enter into the contract and furnish the bond required the right Is reserved to reject any or all bids proposal submitted will be opened at the office of the president of the board at moab utah at 10 0 clock a m july C 1828 0 A ROBERTSON president W R MCCONKIE clerk board of education grand county school district first pub june 21 last july 6 |