Show n MINES OF SEARCHLIGHT Sum Soul I ii ii of or a r Ore Oio I le lug In Iu iiii U u ite etto I to 3 The he dismantling dl of ot the Colorado mill of or the Quartette tte Mining company a a 11 C Uti c of u the Mining ll U view viets h I going with dispatch mill mid will wI It In Li completed coin t three weeks w in till Quartette mule the put Ia t week a II lirio boil hOtly of 30 10 0 ore bent heNI opened In 11 the level while the he MO bOO and ami lOO are ure show up lip mm better than thun ever The rh two ore tho huts hns developed in Inthe the tho Ih upper levels leel mo time converging with 1111 and the tho Indications ore lire that the JUel will with ono Immense Immen c or ore body ho In place of ot th tm two above On the tho Hidden claIm on III Which deep hUll him boon heen In III during the lu t 1 three thre week A 11 body hod of oC milling ore ure Ima hUI been he opened right ut tit time tho tur ur lIr f o ri n I width of or 01 tI J hns ben been bec from rain wall vail to tu ti wall A t jeep deep will b bg put Iut down it lit once oner on Oil the time II with the Hie doublet purpose of if the tiu new lOW strike and of or do tic mb looping lo phi z nn a mu additional I tim water atur supply III Hidden the Noble Noli In which hl h nn nil unu h How of cC water encountered some som months 1110 and It H la l expected that Illat the lIml water channel will bo he cut on the tho Hidden Treasure vein the Immediate le Installation of 10 from the Iho old river mill null In vIew lev an un In Increased creased water supply Is Iti nn an Imperative necessity nece |