Show S SEWER EXTENSION I Iu BID IS REJECTED I Because Because u it v was as too o far in excess of the city engineers engineer's estimate of 22 the city commission commission- has rejected a bid from Heuser Sa Ba Packard Packard Pack Pack- ck- ck ard for 70 for the proposed I sewer extension in Poplar Grove Bids on the construction of a bridge over the surplus canal on Redwood road have been opened and referred I to the city engineer for tabulation Bonds coVering cohering contracts held by P P. J J. J Moran have been received and approved ap- ap proved pio by the commission I |