Show DELAY DECISION ON N PAVING CENTER STREET Paving Paving- of ot Center street was proposed proposed pro pro- pro pro-I posed to tho tim city commission today by Commissioner Wells and a delegation of or Center street property owners at attended attended at- at tended tende l the tIle meeting to the use usa of ot Instead d of or concrete pavement if the tho Improvement i Is made Action was waa delayed one week Estimates of tilt the city engineer were at hand showing howing that tho city's s 's share of the tho expense c would be bo Cit City Au Auditor Bock Dock informed the tho commission commis sion that tho the present surplus of the tho city I Is and that of that amount be bo may un unavailable sin sin- I available on account of the Ic legislatures legislature's failure to reduce tho city library levy limit Tho commission wan waa os Inclined to the opinion that the expense cannot be bo In Incurred Incurred In- In at this time As to tho the type of ot pavement a to be used the engineer en has hns recommended concrete as ai being more desirable on a n. grade such as 9 that of Center Canter street and nd the commission lon lonI showed a disposition to accept his recommend recommendation rec rec- I |