Show MilLER HILL READY TO CONTiNUE WORK I I Management Is Elated Over Occurrence of Gas in Tunnel Tunnel I At t the tile Miller 11 1 Hill ill 11 property In lii Am American Amer r- r ican Fork time m management Is Just ready to push the fo face faco of or the thE main miln tunnel ahead after nCr several v rl days days' shutdown shut hut down n do owing to nn an unusual flow Cow of or gas which was struck at nt n a n point about 1300 feet from front th the mouth of tho tile tunnel Tho delay tJay will vIll 1 be he only t temporary f as 38 s new equipment consisting of If motor fan enn and additional has been sent ent up tip to lo mm take care of the tho gas g-as lS situation I Tho Tim management is somewhat elated over tho the of oC gas n nn an the Dutchman property In itt early arly days ays en encountered encountered en- en n. n countered ga teas as In th tho lower lowel tunnel at a aI af f r point un under er the main ore channel I I The appearance of or gas ras and the survey I of if the Dutchman workings would In- In that the tunnel is now un under In-I In fr and nt in Ill direct 11 lino of or the Dutchman ore I channel In the tho I I The Ilie tunnel will vili wi h be pushed as speedily speedily ly I as possible tow towards the am so xo called Pacific Pa- Pa cie fissure which should h bo 10 found I Fa Inthe in inthe the tho at any limo within a fi I dl distance nol riot to exceed feet feet Indications are arc that th the face of the I tunnel is approaching a hip big break or I fissure Heretofore the formation has hac boon leen nearly horizontal but hut with the tho I tat list round of oC shuts shut has Ilas turned and antl I Is dipping the tho lull hill hil nt ot an all angle of or 13 15 d degrees into I General Manager anaI W. W Lester Man rum has haM returned from Crom California and with Director J. J C. C Jensen JensEn made mah n a I visit to the property today locy |