Show I GEMINI GEMIMI MINE RESUMED lORE ORE SHIPMENTS MONDAY I Th The shipment of ore was resumed at the tile Gemini property on Monday Mon ay of this week nearly two weeks of underground un un- un work being lose los as 38 a result of or an accident to tile the c cage ge and cable Not more than a weeks week's time would have been required for the repairs but hut the tile management too took advantage of the shutdown to make male some sonic improvements im at the collar of the shaft and to put the tile finishing touches to toa toi i a nc new loading station which will fa fa- j i the handling of the present i heavy tonnage says Eureka Reporter 1 I A short time ago a railroad spur was vas constructed to the Ule Gemini mine mute and amI this spur together with jUt the tile new loading station will make it possible i for the mine to ship over the Rio Grande as well as the Salt Lake Route The distance that the ore must be is is' mater materially reduced by loading on on the tile new railroad spur Everything is now moving along in nice shape in the he underground workings work I ings of the tile Gemini and a large amount I of work is also being done through the company's shaft for the benefit of ot otI the Ridge Valley Vaney and ancl the tile newly organized organized or or- I Eureka Mines company |