Show Teton Power Sites to toBe Be e Investigated BOISE Ida 1 Nov 27 AP In AP-In- In Investigation of the dam reservoir and amI power sites for the Teton river reservoir project on Teton river thirty five miles mlles east cast of Idaho Falls as planned by H H. J. J F F. Samuels will willbe willbe willbe be conducted by George N. N Carter commissioner of reclamation on Monday onda Commissioner Carter will leave tomorrow night for Idaho Falls s. s Under Mr Samuels' Samuels application to divert second feet of water from Teton river for tor the storage of feet acre-feet in the reservoir reservoir c construction construction con con- n- n will start as soon as surveys surveys sur- sur veys are completed and approved Although the project Is designed principally for the generation of power a supplemental supply of water water wa wa- ter tel will be furnished lands in the vicinity of St. St Anthony and Rex- Rex burg |